{ "id": "107", "instruction_en": "On Sheet3, insert on the left side of the sheet a results table with a top-header showing the series names “BSCTMP” and “SBSK,” and two subsections with left-hand labels “1–6 month lag” and “1–6 month lead. In the 1–6 month lag section, quantify the timing relationship by calculating Pearson correlations between SBSK and BSCTMP shifted 1–6 months later and entering the resulting coefficients under the headings “1 month lag” through “6 month lag.” In the 1–6 month lead section, calculate correlations between BSCTMP and SBSK shifted 1–6 months later and entering the coefficients under the headings “1 month lead” through “6 month lead.", "source_files": [ "107_src_0.xlsx" ], "source_files_urls": [ "https://huggingface.co/datasets/FinWorkBench/Finch/resolve/main/files/107/107_src_0.xlsx" ], "task_type": "Calculation", "business_type": "Predictive Modeling", "task_constraints": "You will be given an Excel file as input. Please perform all required operations by modifying the existing workbook. You may add new sheets if necessary, but you must preserve all original sheets and their contents. Do not replace the workbook with a new file that contains only the results. Return the full updated workbook, including all original sheets plus any newly added sheets." }